- Ö 1 Site visits and evaluation of site visits
- Ö 1.1 Visit to the cemetery - designation of a burial plot for lawn urn graves - creation of a new urn burial plot - design measures in the cemetery
- Ö 1.2 Inspection of the possible location for the container of the KiTa forest group and the new playground area of the KiTa "Antoniuszwerge"
- Ö 1.3 Inspection of the mountain road "storm damage"
- Ö 2 Information about the update of the drainage concept "Unterdorf"
- Ö 3 Reports and Miscellaneous
- Ö 3.1 Care of the plants along the B 268
- Ö 3.2 Mowing work on the rain retention basin in the area of the football pitch
- Ö 3.3 Sale of plot 193 in the first construction phase of the "Höthkopf" development area
- Ö 3.4 Mulching of the undeveloped plots of the first construction phase "Höthkopf"
- Ö 3.5 Construction of a carport at Trierer Straße 1a
- Ö 3.6 Energy-saving work on the sports field building
- Ö 3.7 Working at the daycare center
- Ö 3.8 Installation of dog toilet bag stands